SoWhat wrote:Source of the post leads me to believe that there must be some sort of "half-life of construction theory"...
...perhaps Stuart can supply us with that formula as he's much better at math than I am.
Absolutely! That's very easy, actually. The basic rule is simple:
1) "Building a studio always takes way longer than you ever believed it would, even in your darkest nightmare!"
(That's "Stuart's First Law of Studio Construction"...
)
Stuart's Second Law of Studio Construction:
2) "Building a studio is far more complicated than building a rocket to get to Mars, and the complexity increases with every passing hour".
Third law:
3) "It costs way more than you ever dreamed it could. Shockingly more!"....
More seriously, I haven't really put together any numbers, but at a rough guesstimate I'd say that on average it takes about two to three years for a typical home studio builder to get from start to finish. The fastest I've ever seen it happen was with a client in LA, who absolutely needed it done "right now", and hired a team of 8 builders to work on his garage conversion. It took just over three months from start to finish, and it was CRAZY! The client contacted me on March 25 and wanted the place finished by May 16... That was a bit unrealistic (!), but it was actually finished enough for the first recording session on Jun 29... and fully completed in mid July (this was back in 2013).
It was really nuts.... The construction crew started ripping out stuff while I started designing, and it was a "just in time" process: for each stage, I managed to complete that part of the design "just in time" for them to build it. This included rebuilding the entire roof truss system from the inside, without taking off the roof, modifying them to have a load-bearing ridge-beam and collar-tie trusses, so we could have higher ceilings, as well as the complete two-room studio (CR, plus a mini "live room", with one stone wall!), all with high isolation, and the bathroom, and entrance lobby. Totally crazy. I hardly slept during those three months, and I'm pretty sure the construction crew didn't either! Here's how it turned out:
Control room (complete with Hammond organ along with a true Leslie box, plus an upright piano!):
"Mini Live Room" with stone wall:
But that's an exceptional case! VERY Exceptional. With non-stop design going on at the same time as a complete team of 8 professional builders, all working at once. Four months, and exhausting for everyone. And a sensible budget.
Now, unfortunately, that's what most first-time builders seem to imagine it will be! Typically, folks figure they can sketch out a few lines on the back of a bar napkin tonight, go buy some drywall, studs and nails tomorrow, start building the next day, and be finished by the end of next week!.... It's great to be enthusiastic, but you also have to be realistic. And 2 to 3 years is realistic, for a typical home studio build.
But far more important than planning time for the construction, is planning time for the design! That's where most first-time studio builders greatly underestimate things: the time and effort involved in design. Even if you already have a good background in acoustics, and a good background in construction, and a good background in design, it still takes time. If you don't have those skills, then you also need to account for the time to learn them, before you actually start the design process. I would estimate that, for someone starting from scratch, such as a musician, mix engineer, home movie buff, audiophile, etc. who understands what they want but doesn't have much background in acoustics or construction, it will take about 3 to 6 months of learning about those, to become proficient enough to do the design. Probably more.
Of course, if you start reading trough the new series here on the forum,
How to design and build your own studio Then you can cut down on that time a bit!
(Well, you will be able to once I finish writing it.... )
And do take note of Andre's signature block... (and I think Andre is an optimist here: he should maybe add a few extra points for design...).
Sorry to hijack the thread, but it is definitely a subject worth discussing!
- Stuart -