My control room build!

Document your build here: All about your walls, ceilings, doors, windows, HVAC, and (gasp!) floated floors...
User avatar
Starlight
Full Member
Posts: 466
Joined: Wed, 2019-Sep-25, 12:52
Location: Slovakia, Europe
Contact:

My control room build!

#16

Postby Starlight » Tue, 2020-Aug-18, 15:02

MarkJJ61 wrote:Source of the postPost #7 is pure gold.
What a coincidence I have been studying post #7 these past few days, along with Myth: Modes and room ratios: "I have too many modes! I need a better ratio to get rid of them" Now we also have Modes, room ratios, and the "Schroeder Frequency" or "Transition Frequency", Stuart is either writing faster than I can study or I will have to work less to have more study time!



User avatar
Starlight
Full Member
Posts: 466
Joined: Wed, 2019-Sep-25, 12:52
Location: Slovakia, Europe
Contact:

My control room build!

#17

Postby Starlight » Thu, 2020-Dec-24, 23:03

Abraham, how is your studio? Is it finished?



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#18

Postby FeedTheStudios » Sat, 2021-Apr-10, 16:35

After almost two years and a pandemic, I'm finally resuming work on the studio!
Attachments
WhatsApp Image 2021-04-10 at 2.33.46 PM.jpeg
WhatsApp Image 2021-04-10 at 2.33.45 PM.jpeg
WhatsApp Image 2021-04-10 at 2.33.45 PM (4).jpeg
WhatsApp Image 2021-04-10 at 2.33.45 PM (3).jpeg
WhatsApp Image 2021-04-10 at 2.33.45 PM (2).jpeg
WhatsApp Image 2021-04-10 at 2.33.45 PM (1).jpeg



User avatar
Soundman2020
Site Admin
Posts: 890
Joined: Thu, 2019-Sep-19, 22:58
Location: Santiago, Chile
Contact:

My control room build!

#19

Postby Soundman2020 » Wed, 2021-Jun-30, 21:35

After almost two years and a pandemic, I'm finally resuming work on the studio!

:yahoo:

This is GREAT news, Abraham! Excellent! I'm so pleased to see things moving forwards again. :thu:

- Stuart -



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#20

Postby FeedTheStudios » Wed, 2021-Oct-06, 20:15

Soundman2020 wrote:Source of the post
After almost two years and a pandemic, I'm finally resuming work on the studio!

:yahoo:

This is GREAT news, Abraham! Excellent! I'm so pleased to see things moving forwards again. :thu:

- Stuart -


Yes! I'm just waiting for the sorbothane calculations :D



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#21

Postby FeedTheStudios » Thu, 2021-Oct-07, 18:50

Still waiting :D



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#22

Postby FeedTheStudios » Sat, 2021-Oct-16, 19:27

Here's what happened after the last batch of photos:

After trying my hand at woodworking, I decided to hire a professional carpenter through a somewhat lengthy selection process. The guy arrived with a few tools and stated building the first structure as if he were in a rush, without properly planing and dimensioning the wood. All in all, the job ended being quite sloppy and messy. Then the dude decides to blame the "low quality wood" and proceeds to try and convince me to buy plywood to redo the whole thing based on his design. I didn't know better and agreed.
We tried to get our hands on said materials but the shortage prevented us. Then, the guy ghosted me.

I then had to learn wood framing and find someone who could lend me a table saw (we burnt the motor on ours when an accidental slip put the board in an angle to the saw, forcing it to spin out of place and exert extreme force on the motor), and a jointer.

And I'm glad I did that. The work looks 1000% better than the "professional" carpenter.

So far, I'm finishing both corners with the big hangers and their corresponding baffles and cloth-grill panels. I have no photos of the panels, but I will mount them last to prevent dust and particles getting into them during the construcion process
Attachments
IMG-20210929-WA0003.jpeg
IMG-20210929-WA0001.jpeg
IMG-20211011-WA0003.jpeg
IMG-20211012-WA0002.jpeg
IMG-20211014-WA0000.jpeg
IMG-20211015-WA0001.jpeg
IMG-20211015-WA0003.jpeg
IMG-20211015-WA0009.jpeg
IMG_20210902_154102.jpg
IMG_20210922_171350.jpg
IMG_20211008_125349.jpg
IMG_20211008_125358.jpg
IMG_20211011_093513.jpg
IMG_20211011_101211.jpg



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#23

Postby FeedTheStudios » Mon, 2021-Oct-18, 21:29

Soundman2020 wrote:Source of the post
After almost two years and a pandemic, I'm finally resuming work on the studio!

:yahoo:

This is GREAT news, Abraham! Excellent! I'm so pleased to see things moving forwards again. :thu:

- Stuart -

Sorbothane :D



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#24

Postby FeedTheStudios » Tue, 2021-Oct-19, 15:00

Soundman2020 wrote:Source of the post
After almost two years and a pandemic, I'm finally resuming work on the studio!

:yahoo:

This is GREAT news, Abraham! Excellent! I'm so pleased to see things moving forwards again. :thu:

- Stuart -

Sorbothane



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#25

Postby FeedTheStudios » Mon, 2021-Oct-25, 13:23

Soundman2020 wrote:Source of the post
After almost two years and a pandemic, I'm finally resuming work on the studio!

:yahoo:

This is GREAT news, Abraham! Excellent! I'm so pleased to see things moving forwards again. :thu:

- Stuart -

Dude, sorbothane :D



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#26

Postby FeedTheStudios » Tue, 2021-Oct-26, 19:19

Soundman2020 wrote:Source of the post
After almost two years and a pandemic, I'm finally resuming work on the studio!

:yahoo:

This is GREAT news, Abraham! Excellent! I'm so pleased to see things moving forwards again. :thu:

- Stuart -


Sorbothane :D



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#27

Postby FeedTheStudios » Fri, 2021-Nov-19, 12:17

Progress update! This was all yesterday. Getting ready for today's work.
Attachments
IMG_20211118_115518.jpg
IMG_20211118_115520.jpg
IMG_20211118_143535.jpg



garethmetcalf
Full Member
Posts: 277
Joined: Sun, 2020-Jan-19, 14:35
Location: Derbyshire, Englad

My control room build!

#28

Postby garethmetcalf » Sun, 2021-Nov-21, 19:59

Looking good! Are they your soffit walls or part of the rear treatment?



FeedTheStudios
Active Member
Posts: 12
Joined: Tue, 2019-Oct-08, 16:07
Location: Chihuahua, Chihuahua, México.

My control room build!

#29

Postby FeedTheStudios » Mon, 2021-Dec-27, 20:03

garethmetcalf wrote:Source of the post Looking good! Are they your soffit walls or part of the rear treatment?

Thanks for replying!

They're part of the soffit cabinets. They're what I call the "mid" section, where the speakers go. I will be placing hangers above and below the speaker :D




  • Similar Topics
    Statistics
    Last post

Who is online

Users browsing this forum: No registered users and 18 guests