Studio Build- Central Portugal

Document your build here: All about your walls, ceilings, doors, windows, HVAC, and (gasp!) floated floors...
Dr Space
Full Member
Posts: 162
Joined: Wed, 2019-Sep-25, 05:47
Location: Portugal
Contact:

Studio Build- Central Portugal

#166

Postby Dr Space » Thu, 2022-Feb-10, 15:59

Control Room: This week the bass traps at the rear where completed, the front wall was tiled, the wood floor panels put in, the fabric frames for the walls (they do the ones for the ceiling tomorrow), the fabric arrived and that is about it.. Here are some pictures.. :mrgreen:
Attachments
D39F1952-DA5A-49F5-8622-E37486E7065B.jpeg
Another view out the control room door
5E7387B4-47A8-4F20-BAF0-90298D672D11.jpeg
Floor and fabric frames
9E5FECD1-CD16-4943-935C-04397A1C0E8D.jpeg
Bass Traps in rear of control room
7ED4B73A-15C1-4293-ABE2-BB06429CACAA.jpeg
Front wall tiled



psb_87
Active Member
Posts: 34
Joined: Thu, 2019-Dec-26, 21:41
Location: Carmarthenshire, Wales, United Kingdom

Studio Build- Central Portugal

#167

Postby psb_87 » Fri, 2022-Feb-11, 06:38

Hey Glenn,

Thanks for the tip. looks like it could be available in the UK, but haven't investigated too much yet. My initial idea was to use timber for all the window framing and then use a uPVC cap bonded over it for protection, a somewhat similar approach to what you described.

Paul



psb_87
Active Member
Posts: 34
Joined: Thu, 2019-Dec-26, 21:41
Location: Carmarthenshire, Wales, United Kingdom

Studio Build- Central Portugal

#168

Postby psb_87 » Fri, 2022-Feb-11, 10:22

Dr Space wrote:Source of the post Control Room: This week the bass traps at the rear where completed, the front wall was tiled, the wood floor panels put in, the fabric frames for the walls (they do the ones for the ceiling tomorrow), the fabric arrived and that is about it.. Here are some pictures.. :mrgreen:


Looking fantastic and very exciting!

Are the hanging panels hanging or chains or actually fixed rigidly into place with timber cleats?

(Also, if you get a moment, please could take a look at my question for you in my earlier reply about what you used for your exterior windows frames?)

Thanks!

Paul



Dr Space
Full Member
Posts: 162
Joined: Wed, 2019-Sep-25, 05:47
Location: Portugal
Contact:

Studio Build- Central Portugal

#169

Postby Dr Space » Fri, 2022-Feb-11, 14:55

psb_87 wrote:Source of the post
Dr Space wrote:Source of the post Control Room: This week the bass traps at the rear where completed, the front wall was tiled, the wood floor panels put in, the fabric frames for the walls (they do the ones for the ceiling tomorrow), the fabric arrived and that is about it.. Here are some pictures.. :mrgreen:


<Looking fantastic and very exciting!

Thanks Paul....

<Are the hanging panels hanging or chains or actually fixed rigidly into place with timber cleats?

They are fixed semi-rigid with timber...

<(Also, if you get a moment, please could take a look at my question for you in my earlier reply about what you used for your exterior <windows frames?)

I believe the exterior windows are all gray aluminium frames. The outer glass is tinted (as we get strong sun here in Portugal) and the inner glass is laminated.

Thanks!

Sure... More pictures soon. They have another 10 day break so nothing more will happen for a bit.
scott


Paul



Dr Space
Full Member
Posts: 162
Joined: Wed, 2019-Sep-25, 05:47
Location: Portugal
Contact:

Studio Build- Central Portugal

#170

Postby Dr Space » Sat, 2022-Feb-19, 15:48

Well, Joules did not work at all this last week and has informed me they are not coming this coming week either. A bit frustrating as we are nearly half way there and this could soon be done. Anyway, the linoleum floor for the live room is supposed to arrive on Tuesday. Doors for the control room and live room should come the week after. The HVAC people were to install the first week in March but since Joules has not worked all last week or this coming week, there is no ventilation materials put in by Joules yet. Also the door frames have not been adjusted as they were supposed to. Just have to be patient..



Dr Space
Full Member
Posts: 162
Joined: Wed, 2019-Sep-25, 05:47
Location: Portugal
Contact:

Studio Build- Central Portugal

#171

Postby Dr Space » Fri, 2022-Mar-04, 11:19

The fabric is up on the walls now.. Joules is working on cables for the lights and then he can do the ceiling next. :mrgreen:
Acoustic doors and HVAC systems will probably be installed next week.
Attachments
866650F0-3B43-41AE-8CE8-13C82F60F31E.jpeg
9E41738E-371E-4F14-8703-AB3B9738485C.jpeg



Dr Space
Full Member
Posts: 162
Joined: Wed, 2019-Sep-25, 05:47
Location: Portugal
Contact:

Studio Build- Central Portugal

#172

Postby Dr Space » Wed, 2022-Mar-09, 07:28

The acoustic doors were put in yesterday... Looks Great..... :mrgreen:
Attachments
C22FB470-5052-4554-B206-9FC0D4E37B0F_1_105_c.jpeg
4E96B518-9125-4B64-BE2E-9B6B56C1409A_1_105_c.jpeg



User avatar
Starlight
Full Member
Posts: 466
Joined: Wed, 2019-Sep-25, 12:52
Location: Slovakia, Europe
Contact:

Studio Build- Central Portugal

#173

Postby Starlight » Wed, 2022-Mar-09, 08:04

Congratulations, Scott, I am so please to see the progress and especially the doors.



Dr Space
Full Member
Posts: 162
Joined: Wed, 2019-Sep-25, 05:47
Location: Portugal
Contact:

Studio Build- Central Portugal

#174

Postby Dr Space » Mon, 2022-Mar-14, 10:13

Joules returns tomorrow and I suspect they will put up the diffusers he has been building in his workshop in the live room, continue with the electrics and lights in the control room and put the fabric frames up on the ceiling. Will know more tomorrow. :mrgreen:



psb_87
Active Member
Posts: 34
Joined: Thu, 2019-Dec-26, 21:41
Location: Carmarthenshire, Wales, United Kingdom

Studio Build- Central Portugal

#175

Postby psb_87 » Mon, 2022-Mar-14, 12:56

Cannot wait for your updates! Feel free to take as many pictures as you like, I don't mind at all...

:P



Dr Space
Full Member
Posts: 162
Joined: Wed, 2019-Sep-25, 05:47
Location: Portugal
Contact:

Studio Build- Central Portugal

#176

Postby Dr Space » Wed, 2022-Mar-16, 13:58

https://youtu.be/gO9Pp_WiNG4

A short video walk through last week..
Enjoy..
scott :mrgreen:



psb_87
Active Member
Posts: 34
Joined: Thu, 2019-Dec-26, 21:41
Location: Carmarthenshire, Wales, United Kingdom

Studio Build- Central Portugal

#177

Postby psb_87 » Thu, 2022-Mar-17, 19:49

Dr Space wrote:https://youtu.be/gO9Pp_WiNG4

A short video walk through last week..
Enjoy..
scott :mrgreen:


Seems you have the video set to private :(



Dr Space
Full Member
Posts: 162
Joined: Wed, 2019-Sep-25, 05:47
Location: Portugal
Contact:

Studio Build- Central Portugal

#178

Postby Dr Space » Sun, 2022-Mar-20, 11:34

Hum.. I thought you could see it even if it was private as long as you had the link??? I do not want to make it public as I have hundreds of followers on my youtube feed for my band... Maybe a link to a dropbox??? I should make another one as the control room is finished (cosmetically) and just needs the HVAC vents, heating/cooling unit and wiring put in. I hope to make some measurements first thing when Joules gets back on Tuesday.,

Got the mixing desk wood cut and stained and Joules will assemble it next week, I guess. They got all the HMDI, CAT6, electricity and audio cables prepared last week for the boxes on the walls in the live room. Joules hopes to finish in 8 working days. I still have no date for getting the floor in the live room though.... here are a couple of pictures..
Attachments
32DF9C8D-4DE5-460A-BD7B-8C2BE7C818B0.jpeg
2B1215D7-A841-4890-9F4C-00CD3E268866.jpeg



psb_87
Active Member
Posts: 34
Joined: Thu, 2019-Dec-26, 21:41
Location: Carmarthenshire, Wales, United Kingdom

Studio Build- Central Portugal

#179

Postby psb_87 » Sun, 2022-Mar-20, 16:32

Looks great

If you make the video "unlisted" then we can see it, but if you make it private then only you can see it or those youtube accounts that you invite to see it. Basically, if you make it unlisted and provide the link then we can see it.



Dr Space
Full Member
Posts: 162
Joined: Wed, 2019-Sep-25, 05:47
Location: Portugal
Contact:

Studio Build- Central Portugal

#180

Postby Dr Space » Mon, 2022-Mar-21, 05:15

A picture of the control room with the stained desk (not yet assembled and I also realized one of the 19" rack bays is backwards.. You get the idea anyway... Looking amazing.... :mrgreen:

scott
psb_87 wrote:Source of the post Looks great

If you make the video "unlisted" then we can see it, but if you make it private then only you can see it or those youtube accounts that you invite to see it. Basically, if you make it unlisted and provide the link then we can see it.


Made the video Unlisted now...
\Thanks
scott
Attachments
E06C931D-B028-48EF-BCA4-B9ED48BBF1BA.jpeg
Mixing desk




  • Similar Topics
    Statistics
    Last post

Who is online

Users browsing this forum: No registered users and 24 guests